pvc water pipe
Home| Contact Us | Chinese   
  Certificate  
  Hotline  

News


Yunfu City, pairs of PE water supply pipe network successfully docked

Last night, 11 o'clock, after dozens of municipal water company employees eight days hard work, investment of more than 40 million city water pipe network and the cloud of sulfur water protection project officially began docking SPIDERS. Reporters on the scene saw the construction workers were using flame cutting machine is used to connect head to cut a hole in the drain tube in preparation for implementation of the connections are operating (Figure).

City Water Company, according to the relevant responsible person in charge has been 10 o'clock last night began to drain, to be carried out immediately after emptying the water docking operations (expected to take 4-5 hours). The cloud of sulfur pipe network to connect with the urban drainage pipeline network is a 80 meters long, 60 cm diameter iron pipe, once the Xijiang River water failure, this tube will assume the Cloud City of sulfur water supply task. Equivalent to two water plants also have the ability at any time for urban water supply can be said for the urban water supply on the "double insurance."

It is learned that the "double water supply" main idea is to occur when the West River water supply failure, immediately from the cloud of sulfur water pipe network in a planned way to the urban water supply pipe network. By then, the cloud through which the pipeline sulfur water capacity of 2.5-3 million tons of margin sent to the urban pipe network, an effective solution to the contradiction between city without water. (Daily Yunfu Lin Feng Xu Dengke)
 
Copyright: Jiangyin City, Jiangsu Province, Xinwang Plastic Products Co., Ltd2009
Address:Wuxi City, Jiangsu Province, North Industrial Park, outside the Mazhen Code: 214,406 Technical support:sushang ICP:06,004,067   Management